In 2024, Taumata Arowai released the updated Network Environmental Performance Measures (NEPM) draft National Wastewater standards, covering the 2024/25 compliance year. Throughout the existing NEPM, several changes were made to make the reporting more consistent for both Water and Wastewater operators.
Alongside these changes, a range of additional Wastewater reporting requirements were introduced.
The below guide covers off what these additional reporting requirements are, as well as areas in which Lutra can potentially assist.
A full summary of the changes can also be found here – covering off the wider modifications to the NEPM.
