ID var 5 resized 2

Projects

Here you will find some of our Projects we have worked on, as well as Testimonials/Reviews from our previous and current Clients!
Support User Story

Fonterra

When Fonterra needed a water treatment plant upgrade we mapped out a solution which not only met their needs in the most effective manner but also provided a solution to local farmers running a rural water supply scheme.

Advanced Process Control scaled

Wellington Water

Learn how our advanced process control solutions saved Wellington Water $650k per annum in operating costs, improved plant performance and improved plant efficiency.

CaseStudy Severn Hero rescaled

Severn Trent Water

When Severn Trent Water was searching for the next generation of coagulant dose control to improve plant performance we provided them with a solution.

ivan on site 1 1920 x 1080 resized

Matamata Piako DC

When an operations & maintenance team needed a next generation training system for their staff to improve resilience, reliability, performance and operating efficiency we developed a solution for them.

Hastings District COuncil hero rescaled

Hastings District Council

Hastings District Council was in need of urgent and immediate technical support in designing on top of commissioning the new Brookvale WTP, after a large outbreak in one of their bores. Our Engineering, plus Support team responded.

Wellington Water Compass rescaled

Wellington Water

Struggling to meet drinking water quality standards. Wainuiomata needed serious help in improving their treatment plant, and by replacing a streaming current device with feed forward control, this yields large savings.

Mirrabooka rescaled resized

Water Corporation

Experiencing issues with their ground water sources, Water Corporation were in desperate need of a solution. Where they found one in feed forward coagulant control, with our own Compass solutions.

ID TAG DEPOLOX TE MARUA 1920 x 1080 rescaled resized

Wellington Water

Wellington Water needed to reduce their organisational risk, while improving communication/collaboration on projects. Now they've done that and more, just by using Infrastructure Data.

DSC 0221 1920 x 1080 rescaled resized

Hastings District Council

Managing various wastewater consents, each with different time complications can be difficult. But HDC did it, while simultaneously reducing organisational risk. With some help from our Infrastructure Data software!

PALMY flow meter 1920 x 1080 rescaled resized

Palmerston North City Council

PNCC were in need of an all-in-one solution, tackling their needs around increasing productivity, tracking data, plus accessing/monitoring reports. Infrastructure Data has since solved all their issues and more!

Advanced Process Control rescaled

Horowhenua District Council

If you want to save multiple hours of your time, flipping through textbook after textbook. In an attempt to find a simple solution to a specific problem, learn how HDC did just that with our License to Operate System.

Boil All 1 rescaled

South Wairarapa District Council

What do you do when E.Coli is detected in your large water supply? How do you go about preventing this issue from happening again? We were brought onto this project to do just that, and we succeeded.