Porirua Activated Sludge

Predictive coagulant dose control for wastewater treatment

 

Our Offerings:

 

Compass Box On Site Installation 8 v2

The chemical phosphate removal (CPR) model is designed for phosphate removal in wastewater treatment. It provides the optimum dose to meet phosphate discharge targets at the lowest coagulant dose. It requires on-line Phosphate measurements on the influent prior to coagulant dosing. The Compass algorithms run within a stand-alone controller.
Compass Box On Site Installation 3 v2

The chemically enhanced pre-treatment (CEP) model is designed for pre-treatment in wastewater treatment. It provides the optimum dose to meet performance targets at the lowest coagulant dose. It requires a single UV instrument on the influent prior to coagulant dosing. The Compass algorithms run within a stand-alone controller.

Return on investment ranges from 6 to 24 months

Eliminate under-dosing while reducing risk of plant failure.

Eliminate over-dosing as well as reducing operating costs.

Responds instantly to changing conditions, fine-tuning your treatment process.

Award winning system in use on over 70 plants worldwide.

Read the case studies

CaseStudy Severn Hero rescaled

Severn Trent Water

When Severn Trent Water was searching for the next generation of coagulant dose control to improve plant performance we provided them with a solution

Advanced Process Control v2

Wellington Water

Learn how our advanced process control solutions saved Wellington Water $650k per annum in operating costs, improving plant performance and plant efficiency.

Mirrabooka rescaled resized

Water Corporation

Experiencing issues with their ground water sources, Water Corporation needed an immediate solution. Where they found one in our own Compass solutions.

Our Frequently Asked Questions.

Our Compass Experts

Eike v2

Eike Breitbarth

Customer Manager

Jon C

Jonathan Church

Principal Process Engineer (CPEng)

Ivan

Ivan Ottenheijm

Senior Process Engineer